construction

DSD has been performing tests as these play an influential role in our design and construction processes. These tests are important to our switchboard design and enable us to manufacturer a high quality, fully compliant product. For us, making sure our customers are receiving the very best long-term solution, and our proactive role has seen us testing to the new Standards (AS/NZS 61439:2016)  

Amongst others extensive testing was carried out at the labs below:

                TUV Rheinland Australia Pty. Ltd. High Power Laboratory in Heidelberg, Victoria.

                Austest Laboratories Pty. Ltd. 2/9 Packard Avenue, Castle Hill, NSW

                Austest Laboratories Pty. Ltd. 12 Newfield Road, Para Hills West, SA

 

Summary of reports and certifications

 

IP rating - IP56 test Certificate 0803DESDSD529 - AS/NZS 60529:2013

IP rating - IP56 test Certificate DY201788A - AS/NZS 60529:2013

Corrosion testing enclosure and accessories - Certificate 0803DESDSD529 - AS/NZS 61439.1 2016

Mechanical Operation - Certificate 60390595001- AS/NZS 61439.1 2016

Clearance and creepage - Certificate 60390595002- AS/NZS 61439.1 2016

Temperature rise test (main bus incomer and distribution bars) - Certificate 60390595003 - AS/NZS 61439.1 2016 10.10.2.3.7

Temperature rise test (outgoing units) - Certificate 60390595004 - AS/NZS 61439.1 2016 10.10.2.3.7

Short Circuit withstand test (630A Cabled assembly - 28Ka Conditional) - Certificate AU21WVV2001 AS/NZS 61439.1:2016, clause 10.111.5.3.2 & 10.11.5.3.3

Short circuit withstand Test (630A Bussed assembly -  36Ka Withstand 1 sec) - Certificate AU2111QQ001 AS/NZS 61439.1:2016, clause 10.111.5.3.2 & 10.11.5.3.3

Short circuit withstand Test (1600A MSB -  36Ka Withstand 1 sec) - Certificate AU21Q38G001 AS/NZS 61439.1:2016, clause 10.111.5.3.2 & 10.11.5.3.3

Assemblies for use on construction sites (Complete assembly) - Certificate - ACTE202102190 AS/NZS 61439.1:2016, AS/NZS 61439.4:2016

Certifications